i've got a boiler to install next week the F&E tank is fitted on the loft floor,
The customer wants the boiler fitting as high as possible, Iam thinking of fitting a combined coldfeed & vent.
so the flow and return come out the top of the boiler across 6 inchs then drop under bedroom floor fit an auto vent on the top of the flow T the coldfeed & openvent into the flow 1 meter below tank in the loft.
The tank can't be raised up & can't seal the system.
I can't T straight off the top of the boiler as per manufactures instructions
any input lads?
i've got a boiler to install next week the F&E tank is fitted on the loft floor,
The customer wants the boiler fitting as high as possible, Iam thinking of fitting a combined coldfeed & vent.
so the flow and return come out the top of the boiler across 6 inchs then drop under bedroom floor fit an auto vent on the top of the flow T the coldfeed & openvent into the flow 1 meter below tank in the loft.
The tank can't be raised up & can't seal the system.
I can't T straight off the top of the boiler as per manufactures instructions
any input lads?