- Joined
- 17 Jan 2008
- Messages
- 89
- Reaction score
- 0
- Country
Hi,
I am planning on installing a low profile shower tray where the existing shower was. I won't be able to get the waste to line up with the existing waste. Do I need to channel out the concrete floor for the waste pipe to sit in and run it to the existing waste? If so how deep? How deep is the DPC normally?
What type of waste would be required?
I've attached a photo which will hopefully help, its not very clear but you can just about make out the brass waste.
I am planning on installing a low profile shower tray where the existing shower was. I won't be able to get the waste to line up with the existing waste. Do I need to channel out the concrete floor for the waste pipe to sit in and run it to the existing waste? If so how deep? How deep is the DPC normally?
What type of waste would be required?
I've attached a photo which will hopefully help, its not very clear but you can just about make out the brass waste.