Sorry this may sound a petty question but I'm getting paranoid about when the inspector calls!
I've slightly overestimated the depth of some of my metal boxes and when the walls are skimmed (double layer of p/b) they will be around 4or 5 mm below flush level. Does this matter?
Thanks, Bob
I've slightly overestimated the depth of some of my metal boxes and when the walls are skimmed (double layer of p/b) they will be around 4or 5 mm below flush level. Does this matter?
Thanks, Bob