mims continuity testing

Joined
25 Jun 2005
Messages
12
Reaction score
0
Location
Clwyd
Country
United Kingdom
could anyone tell me what type of meter you would use to carry out cpc continuity when copper sheath acts as cpc and how the meter would be connected thanks for any help
 
Sponsored Links
Link both conductors measure resistance between both, devide by 2 and subtract meter leads resistance, that will give resistance of 1 conductor. Link 1 conductor to the copper sheath, go to other end of mims run and measure between conductor and copper sheath, deduct the resistance of meter leads & conductor you are left with the outer copper sheath (cpc) resistance (R2) showing you have continuity of the cpc.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top