I had a room skimmed (part re-skimmed onto old plaster, part boarded and skimmed) and I'm having trouble with painting.
It's been 4 weeks and I'm convinced the plaster is completely dry. I did a mist coat of approx 60/40 using Leyland white matt emulsion. It dried to the touch almost instantly. I gave a second mist coat of the same ratio, again dried instantly.
24 hours later the paint just wipes off with a damp cloth.
Is this to be expected? Will a normal coat be ok now or do I need to do something else?
Thanks
It's been 4 weeks and I'm convinced the plaster is completely dry. I did a mist coat of approx 60/40 using Leyland white matt emulsion. It dried to the touch almost instantly. I gave a second mist coat of the same ratio, again dried instantly.
24 hours later the paint just wipes off with a damp cloth.
Is this to be expected? Will a normal coat be ok now or do I need to do something else?
Thanks