hello and thanks to all that answer,
Could somebody please talk me through bonding requirements for a bathroom. At the moment all the copper pipes are bonded from the earth point at the CU with 4mm cable at the combi boiler ,situated across the landing (approx 1.5 metres). The lighting and shower circuit are protected by by an RCD on a split load CU.
Am i still required to bond each copper pipe in the bathroom to each circuit entering it?
Could somebody please talk me through bonding requirements for a bathroom. At the moment all the copper pipes are bonded from the earth point at the CU with 4mm cable at the combi boiler ,situated across the landing (approx 1.5 metres). The lighting and shower circuit are protected by by an RCD on a split load CU.