I'm laying a new concrete floor on Monday to my existing garage. I'm having to hire an "Easy Float" with the extendable handle as I can't get around the sides to finish it off.
I'll level the concrete off using battens that I've screwed to the walls, but how long do I leave the concrete before using the float, so that I get a nice smooth finish?
Thanks
I'll level the concrete off using battens that I've screwed to the walls, but how long do I leave the concrete before using the float, so that I get a nice smooth finish?
Thanks