I am about to have engineered woods flooring laid on a concrete floor that has been sealed.
Before that I am going to burry 2 central heating pipes (going to 1 rad), will I need to lay some more bitumen when the pipes have been buried?
Before that I am going to burry 2 central heating pipes (going to 1 rad), will I need to lay some more bitumen when the pipes have been buried?