Hi Guys,
I have almost completed my extension and am getting to the stage where I have to get my meter moved.
I have a quote from my provider to do this.. However I am only supplied via a 20mm mdpe pipe (inserted through the old steel pipe) and they would just use this for my move.
Will this 20mm pipe be enough to feed my two boilers - 14kw for u/floor heating and 30kw for rads, a gas range is also planned but I am unsure which model as yet as not at this stage...
They are reluctant to change/upgrade the 20mm pipe as this will then come as a free upgrade to my service. What they are pushing me to do is have my meter moved first and then upgrade at a later date (if required) I suppose it is so they can charge me for the meter move...
Can someone advise me if I need to get the supply mains upgraded at this point... The U6 meter is 15 meteres from the supply.
Many thanks....
I have almost completed my extension and am getting to the stage where I have to get my meter moved.
I have a quote from my provider to do this.. However I am only supplied via a 20mm mdpe pipe (inserted through the old steel pipe) and they would just use this for my move.
Will this 20mm pipe be enough to feed my two boilers - 14kw for u/floor heating and 30kw for rads, a gas range is also planned but I am unsure which model as yet as not at this stage...
They are reluctant to change/upgrade the 20mm pipe as this will then come as a free upgrade to my service. What they are pushing me to do is have my meter moved first and then upgrade at a later date (if required) I suppose it is so they can charge me for the meter move...
Can someone advise me if I need to get the supply mains upgraded at this point... The U6 meter is 15 meteres from the supply.
Many thanks....