Need some advice!
Planning to have a new patio at the end of the garden, which will be contained on 3 sides by stone garden walls and to the front edge by wooden sleepers.
I plan to put down Type 1 mot (how deep - 40mm?) which I will compact to give a firm base.
Do i need to bed the slabs on wet mortar or would a bed of sand or a dry mix be enough.
The use will be light/foot traffic - table and chairs and kids playing on it.
thanks
Planning to have a new patio at the end of the garden, which will be contained on 3 sides by stone garden walls and to the front edge by wooden sleepers.
I plan to put down Type 1 mot (how deep - 40mm?) which I will compact to give a firm base.
Do i need to bed the slabs on wet mortar or would a bed of sand or a dry mix be enough.
The use will be light/foot traffic - table and chairs and kids playing on it.
thanks