I have just removed my old bathroom tiles (they had embossed blue bows, so I couldn't tile over the top)
They came off easily but either took some plaster with them or left the adhesive on the wall.
So on the wall now is either:
Bare concrete (rough plaster)
Smooth top layer plaster
plaster with loads of super hard adhesive welded to it.
after hours of scraping its now 30% concrete, 50% adhesive 20% bare nice plaster.
should I tru to get it all to bare concret and tile onto that?
Should I try to get as much as posible to nice plaster ?
Please Help Me !!!
Joe
They came off easily but either took some plaster with them or left the adhesive on the wall.
So on the wall now is either:
Bare concrete (rough plaster)
Smooth top layer plaster
plaster with loads of super hard adhesive welded to it.
after hours of scraping its now 30% concrete, 50% adhesive 20% bare nice plaster.
should I tru to get it all to bare concret and tile onto that?
Should I try to get as much as posible to nice plaster ?
Please Help Me !!!
Joe