- Joined
- 2 Jan 2007
- Messages
- 23
- Reaction score
- 0
- Country
Guys,
Recently got a new boiler put in, as i didnt want the old flu hole being bricked up with non matching roughcast i decided to leave the old flu in place with the metal guard still on the outside.
In the inside i just put a bit of boarding over the hold and silicon sealed it.
I know this is a bit of a bodge, but will this show up in a survey? If so, how much is it likely to cost to put right?
Cheers
Recently got a new boiler put in, as i didnt want the old flu hole being bricked up with non matching roughcast i decided to leave the old flu in place with the metal guard still on the outside.
In the inside i just put a bit of boarding over the hold and silicon sealed it.
I know this is a bit of a bodge, but will this show up in a survey? If so, how much is it likely to cost to put right?
Cheers