Hi guy's
We install air conditioning .The make we use always suppliers the outdoor unit then run a 3 core + E inside.
For those which need a 13a max supply in a commercial situation we would normally just spur off then through the wall to the outdoor unit.If the customer is 'price conscious'
Now in a domestic situation we would be non Part P compliant doing this. So we often just spur to the indoor unit and run a bigger interconnect (L+N are just effectively piggybacked as they don't go through the unit)
Now we have had a situation where in order to do this we spured off from a double socket on an outside wall run the cable outside (without terminating etc) back inside to the indoor unit with another fused spur. The run the interconnect as per above
Therefore we have run a cable outside but both ends are inside
Is this part P complaint??
Cheers
Richard
We install air conditioning .The make we use always suppliers the outdoor unit then run a 3 core + E inside.
For those which need a 13a max supply in a commercial situation we would normally just spur off then through the wall to the outdoor unit.If the customer is 'price conscious'
Now in a domestic situation we would be non Part P compliant doing this. So we often just spur to the indoor unit and run a bigger interconnect (L+N are just effectively piggybacked as they don't go through the unit)
Now we have had a situation where in order to do this we spured off from a double socket on an outside wall run the cable outside (without terminating etc) back inside to the indoor unit with another fused spur. The run the interconnect as per above
Therefore we have run a cable outside but both ends are inside
Is this part P complaint??
Cheers
Richard