am a fully qualified spark, 2381,2391,hnc, onc, full apprentiship ect.....
work in industry and dont do much domestic. mate wants a socket installing about 3 foot from CU, loads of spare ways, no sockets close on existing circuits to spur from so best thing to do would be install a short radial....easy.
by doing this though im making a new circuit and should notify.... like hell im notifying for one socket.
so do i issue a minor making out like there was a socket there and ive replaced the 'damaged' cable
or
issue a EIC as i should ignoring the fact ive stuck two fingers up to notifying
or
do it and give my mate no documents
bloody part p! good idea but poor poor implementation. how can it be that i can install 1000 Amp busbars and design factory installations but i cant add a socket from a domestic CU.
work in industry and dont do much domestic. mate wants a socket installing about 3 foot from CU, loads of spare ways, no sockets close on existing circuits to spur from so best thing to do would be install a short radial....easy.
by doing this though im making a new circuit and should notify.... like hell im notifying for one socket.
so do i issue a minor making out like there was a socket there and ive replaced the 'damaged' cable
or
issue a EIC as i should ignoring the fact ive stuck two fingers up to notifying
or
do it and give my mate no documents
bloody part p! good idea but poor poor implementation. how can it be that i can install 1000 Amp busbars and design factory installations but i cant add a socket from a domestic CU.