patching concrete floor before laying oak

Joined
27 Oct 2005
Messages
23
Reaction score
0
Location
Surrey
Country
United Kingdom
I'm 90% of the way through flooring my dining/lounge room but have come across 2 patches where the fireplaces have been that need filling to bring up to the level of the rest of the floor .

what should i use ? cement based leveling compound (just add water type)

How long should i leave it before laying the wood floor over ? its going to be about .5 inch thick .

Thanks in advance

Derek
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top