Hi,
http://i270.photobucket.com/albums/jj111/rickb_2008/100_9500.jpg
I'd like to move the waterfall and replace it with bricks so that the wall is integral.
I've removed the pond so where you see the pond now it's just flat ground. However the waterfall is still there.
How difficult would it be to brick the hole left by the waterfall? I have spare bricks but would like the same mortar colour at the joints.
Behind the bricks there is a retaining wall so the front layer is cosmetic.
I would not mind getting a brickie to do it if it gets me a matching finish with the rest of the retaining walls. Is it a particularly complicated job? How long would it take a decent brickie to do this?
Any advice would be appreciated.
Thanks
http://i270.photobucket.com/albums/jj111/rickb_2008/100_9500.jpg
I'd like to move the waterfall and replace it with bricks so that the wall is integral.
I've removed the pond so where you see the pond now it's just flat ground. However the waterfall is still there.
How difficult would it be to brick the hole left by the waterfall? I have spare bricks but would like the same mortar colour at the joints.
Behind the bricks there is a retaining wall so the front layer is cosmetic.
I would not mind getting a brickie to do it if it gets me a matching finish with the rest of the retaining walls. Is it a particularly complicated job? How long would it take a decent brickie to do this?
Any advice would be appreciated.
Thanks