Hi All
I have a largish garden which i am hoping to patio but it is taking ages and ages.
I want to cover and area of 25ft by 12ft. Half of this I have already completed by laying cement.
The question I have is on the second half of this. Doing the cement took me an age because I am on my own and can only screed so much by myself so I had to do it at the weekends.
On this second half, can I just dump a LOAD of MOT Type 1 into it to bring it up to the level of the other half and then lay the slabs onto that?
Obviously i would need to put mortar down but can this be dabbed or would i have to put loads down?
Also, can you screed MOT Type 1. I am trying to get out of doing the concreting basically.
Lee
I have a largish garden which i am hoping to patio but it is taking ages and ages.
I want to cover and area of 25ft by 12ft. Half of this I have already completed by laying cement.
The question I have is on the second half of this. Doing the cement took me an age because I am on my own and can only screed so much by myself so I had to do it at the weekends.
On this second half, can I just dump a LOAD of MOT Type 1 into it to bring it up to the level of the other half and then lay the slabs onto that?
Obviously i would need to put mortar down but can this be dabbed or would i have to put loads down?
Also, can you screed MOT Type 1. I am trying to get out of doing the concreting basically.
Lee