P
peter1450
Hi Change of plan in house renovation! Now need to install a gas hob but most of the pipework has already been boxed in. Have a 22mm gas pipe feeding the boiler and have access to T into this about 2 metres away from the position of the hob. Should this be 22mm pipe down to the hob or can i use 15 mm over the 2 metres ? Cheers in advance Pete.
ps , it will be certified when its all complete, you try finding a registered plumber who.s prepared to do these small but neccesary jobs!
ps , it will be certified when its all complete, you try finding a registered plumber who.s prepared to do these small but neccesary jobs!