I am creating a utility & cloakroom off my dining room. The flooring in my dining room has to come up (parquet) and I want to bury two 15mm JG supply pipes to carry hot and cold to the cloakroom, then a cold through to the utility room area. The other end of the supply pipes will be chased into floor next to rising main and hot water (will need to be T'd in). I have not yet had a soil stack installed for the toilet this needs to be done.
My question is where abouts should I bring the supply pipe up? should I do it next to the toilet or sink? What's the norm I guess is what I am asking.
I have JG conduit to run the plastic pipework through, no joins will be buried in the screed.