- Joined
- 31 Aug 2013
- Messages
- 261
- Reaction score
- 1
- Country
I am creating a bathroom in my house and one wall is solid stone, with lime render. I am going to fit moisture resistant board to this wall, and a friend has told me that the wall should be plastered before it is tiled (ceramic tiles). My question is, does the wall need to be plastered or can the tiles be put directly on the moisture resistant board ?