Hi guys ive now leveled off my floor and am ready to start laying my Plywood subfloor.Ive got my 6mm ply sorted and im about to start screwing it down,how spaced out should the screws be and should it just be the perimeter of the sheet that gets screwed or the whole width in a grid fashion?
Also has anybody used lecol 5500 adhesive for parquet on clean blocks (bitumen completely removed),what is the time period before the blocks can be walked on?. Thanks in advance guys.
Also has anybody used lecol 5500 adhesive for parquet on clean blocks (bitumen completely removed),what is the time period before the blocks can be walked on?. Thanks in advance guys.