I am planning on a CCU upgrade (from old Wylex rewirable and replacement of ELCB on TT system) this will be done by a competent person and self certified.
Prior to getting this done I was considering upgrading from TT to PME as the current rod is buried under brick paving and is not accessible. Is conversion to PME a good idea? EON (Central Networks) will do this for £154.
I will need to upgrade the MEB. I was planing on using 16mm and running this through kitchen wall then around outside of building at damp proof course level to the meter box and install a MET there. Is this external routing acceptable with cable clipped to wall or should I run in plastic conduit or use capping?
Prior to getting this done I was considering upgrading from TT to PME as the current rod is buried under brick paving and is not accessible. Is conversion to PME a good idea? EON (Central Networks) will do this for £154.
I will need to upgrade the MEB. I was planing on using 16mm and running this through kitchen wall then around outside of building at damp proof course level to the meter box and install a MET there. Is this external routing acceptable with cable clipped to wall or should I run in plastic conduit or use capping?