I'm adding a porch onto my house it's 2.2 X 1.5. I've built up to dpc and now looking at pouring the floor. Can any one tell me if I have to tie the dpm into the dpc or can I just let the dpm run up past the dpc. I ask this because half of it is the existing house and half is the new porch and would be much easier this way.