Hi, I'm just wondering how this is done? Do you need special concrete at all which wont flow so much? If so will i need to hire a poker?
The step is 300mm with a 600mm overlap.
Thanks
Mike
The step is 300mm with a 600mm overlap.
Thanks
Mike