I`ve been toying with the idea to put mains power to my 2 sheds in my garden.
It was done by someone else before i moved in because theres an old cu in the first shed (not useable)
What i want to do is first connect power to the cu in the house the problem with this is there are no more spaces to and another circuit
Then the cable has to go into our outdoor loo and into the ground to go under a path that goes behind our house (access to all gardens for next door houses) then up into the first shed (our garden) gap is about 2 meters
Now this in the part i need to find out about to get power to the second shed, so needs the cable to go at least 60 meters!! I`ve not really done outdoor wiring and need to know how saftely to do this.
It would be very hard for my to dig a cable the whole way because of concrete and was told i may be able to attached the cable to the fence? Is that legal? also if i can what would be the cheapest way of doing this
I only want a light and one socket in the first shed and same again in second but will need far more sockets in the second
WHAT ARE ALL THE COMPONENTS I NEED (START TO FINISH)
It was done by someone else before i moved in because theres an old cu in the first shed (not useable)
What i want to do is first connect power to the cu in the house the problem with this is there are no more spaces to and another circuit
Then the cable has to go into our outdoor loo and into the ground to go under a path that goes behind our house (access to all gardens for next door houses) then up into the first shed (our garden) gap is about 2 meters
Now this in the part i need to find out about to get power to the second shed, so needs the cable to go at least 60 meters!! I`ve not really done outdoor wiring and need to know how saftely to do this.
It would be very hard for my to dig a cable the whole way because of concrete and was told i may be able to attached the cable to the fence? Is that legal? also if i can what would be the cheapest way of doing this
I only want a light and one socket in the first shed and same again in second but will need far more sockets in the second
WHAT ARE ALL THE COMPONENTS I NEED (START TO FINISH)