I recently had a service carried out on my boiler and the engineer said that the pressure relief pipework was non compliant as part of it was plastic, not all copper. Also, there was no turnback against the external wall (just ejected out over the garden).
Is this correct? Which regulations govern this? There is no guidelines given in the boiler installation manual.
I believe I have the skills to correct this myself, but if it does have to be all copper pipe, can I use the plastic speedfit elbows and connectors etc?
Is this correct? Which regulations govern this? There is no guidelines given in the boiler installation manual.
I believe I have the skills to correct this myself, but if it does have to be all copper pipe, can I use the plastic speedfit elbows and connectors etc?