I will run several wet UFH circuits (ground floor to be screeded system and 1st and 2nd floor pro-fix panels and then to be screeded / levelling compound).
Is it best to pressure test these? If so, what pressure does UFH normally operate at, is it between 1 and 2 bars like a boiler?
The above questions are just for my own interest, builders will be doing the work.