Hi. I need to build up a level on an existing plastered and emulsioned wall. The white area in photo. Only about 3 or 4mm. Do I pva before bonding? Do I score the wall?
Also do I need to pva where I’ve ‘dug out’ some cracks.
Also do I need to pva where I’ve ‘dug out’ some cracks.
Last edited: