Hi, after fitting new work tops, I need to raise the level of the window sills to allow fitting of one those matching low spash backs (long story ).
I am thinking of putting a shuttering across the front of the sill and raising the level with concrete / screed.
I only have about 2 to 3cm available to raise it before I get too far up the window frames, near to the glass.
Will screed be ok for this with tiles on top?
Thanks,
Oscar