Good afternoon guys n gals,
I have an 8 x 6 ft shed which i need to move temporarily to lay some paving.
Do i need to disassemble it or can it be moved in one piece? Access is available to only 3 of the 4 corners so was thinking of using a spanish windlass or similar to provide something substantial to get hold of/grip.
Thoughts and ideas please!
I have an 8 x 6 ft shed which i need to move temporarily to lay some paving.
Do i need to disassemble it or can it be moved in one piece? Access is available to only 3 of the 4 corners so was thinking of using a spanish windlass or similar to provide something substantial to get hold of/grip.
Thoughts and ideas please!