Hi, I’m planning a single storey extension, and want to remove this chimney stack that will (otherwise) be towering over it, and possibly be dropping debris on its roof.
Hopefully these images appear correctly...
IMAGES ARE NOW IN NEW POST BELOW!!
I can either remove the stack until just below the roof tiles (and then making good), or possibly there’s a reasonably cheap way to remove the whole chimney stack down to ground level? Doing this would give more flexibility/space in accessing the extension, rather than needing to ‘work or walk round’ the chimney column.
How feasible is the latter option? Thanks for any advice.
Hopefully these images appear correctly...
IMAGES ARE NOW IN NEW POST BELOW!!
I can either remove the stack until just below the roof tiles (and then making good), or possibly there’s a reasonably cheap way to remove the whole chimney stack down to ground level? Doing this would give more flexibility/space in accessing the extension, rather than needing to ‘work or walk round’ the chimney column.
How feasible is the latter option? Thanks for any advice.