Hi,
I am in the process of redoing my bathroom which was 100% tiled. I have taken off the old tiles which has damaged some of the skim but nothing major. I am looking to 50% tile one of the walls around the bath area and fill in/re-skim to level the other half to paint which includes a recessed window which I tend to tile upto one edge.
Is it best to tile first and then re-skim upto the tile line or skim the whole wall then tile on top?
Cheers
I am in the process of redoing my bathroom which was 100% tiled. I have taken off the old tiles which has damaged some of the skim but nothing major. I am looking to 50% tile one of the walls around the bath area and fill in/re-skim to level the other half to paint which includes a recessed window which I tend to tile upto one edge.
Is it best to tile first and then re-skim upto the tile line or skim the whole wall then tile on top?