Hi,
I have built a stud wall and want to plasterboard it ready for plastering. In preparation for an electrician wiring new sockets on either side of the wall, I need to run some 2.5T&E from one side to the other.
Happy with drilling through the studs to route the cable but:
Does it need to be clipped to the noggins as well?
Should it be run through at any particular height?
Cable will run from an existing socket on the right. behind the grey pillar on the right, through stud work through the cripple studs above the door way, through the studs in the left section of wall and behind the grey pillar on the left, where it will feed a couple of new sockets.
Pic of the wall attached.
I have built a stud wall and want to plasterboard it ready for plastering. In preparation for an electrician wiring new sockets on either side of the wall, I need to run some 2.5T&E from one side to the other.
Happy with drilling through the studs to route the cable but:
Does it need to be clipped to the noggins as well?
Should it be run through at any particular height?
Cable will run from an existing socket on the right. behind the grey pillar on the right, through stud work through the cripple studs above the door way, through the studs in the left section of wall and behind the grey pillar on the left, where it will feed a couple of new sockets.
Pic of the wall attached.