If a ring main cable is clipped to a blockwork wall (vertical), do the new regs specify that you have to use PVC Channel or Conduit or can you just clip it to the wall using cable clips at the regs specified distance and then plaster over?
The PVC channel "Screwfix code 31046" does not seem to offer any protection and does not allow for cables to be pulled through. Except for possible regs, I can't see the point...
(sorting out my screwfix order)
many thanks in advance for your comments,
Alex.