I want to level a small area of my basement floor to use for indoor cycling on a turbo trainer. Area is 2.1m x 1.6m.
The existing floor is cement based and, as well as being generally uneven, slopes about 60mm from highest point.
Mapei 3240 is recommended to depth of 40mm. Could I do 40mm then add another layer on top after a week or so? Or any other suggestions to level it up?