I'm just about to set out a batch of hangers identical to those below. Although the bottoms are 45mm as required, they come out of the box on a slight splay meaning the tops are anywhere between 50 and 60mm.
Being so springy, closing them up to 45mm and getting them to stay there is easier said than done. Am I okay to use the smaller holes on the top with, say, 30mm nails to tac them at the right width prior to mortar going down?
Being so springy, closing them up to 45mm and getting them to stay there is easier said than done. Am I okay to use the smaller holes on the top with, say, 30mm nails to tac them at the right width prior to mortar going down?