- Joined
- 5 May 2004
- Messages
- 8
- Reaction score
- 0
- Country
Hi
Having a small extension. On ground floor intend to locate a shower room
containing an overhead and body jet shower. Bathroom is on first floor.
I was thinking I need 3bar pump for shower and to locate it in the airing cupboard with direct feed from header tank and cylinder.
This will mean approx 4.5 meters of pipe from pump to shower
Has anybody got differing thoughts/comments/advice ?
Thanks in advance
MOD
see item 20
Having a small extension. On ground floor intend to locate a shower room
containing an overhead and body jet shower. Bathroom is on first floor.
I was thinking I need 3bar pump for shower and to locate it in the airing cupboard with direct feed from header tank and cylinder.
This will mean approx 4.5 meters of pipe from pump to shower
Has anybody got differing thoughts/comments/advice ?
Thanks in advance
MOD
see item 20