- Joined
- 7 Feb 2004
- Messages
- 52
- Reaction score
- 0
- Country
When I perform simulated faults to test an RCD , I would normally bridge the N and E - and this trips the RCD.
However, on the PME System the Neutral to Earth is already linked in the CU.
Anyone any views on the best way to simulate or manufacture a fault to test the RCD on a PME system?
Thanks.
However, on the PME System the Neutral to Earth is already linked in the CU.
Anyone any views on the best way to simulate or manufacture a fault to test the RCD on a PME system?
Thanks.