I am about to slate my extension myself, have never done this before, and am wondering how long a professional roofer would take.
The ridge is 9.1m long, the roof measures 4.8m down each slope (2 sides) so total area is 43.68m2. The slates are 600mm x 300mm predrilled for 75mm lap.
I have already felted & counterbattened, but start battening & salting tomorrow - am fully expecting to be very slow compared to a pro, but can anyone suggest how many days a normal roofer would take? (excluding finishing such as fitting lead ridge, gutters etc)
Thanks