I have screwed some 9mm ply over floorboards. I want to use SLC to make it more level before installing a floating engineered floor. I have some primer I am going to go out and get the flexible Mapei Ultraplan Renovation SLC. I have two questions:
- what is the best way of sealing the gap between the edge of the plywood and the wall where the skirting board was? Should I use some ply offcuts and tape them to wall and caulk where it meets the floor and do I need to caulk between the ply joints where the sheets are butted?
- The room is c. 28sqm. Is it wise to attempt to do the whole room or should I just be doing the dips and the bits that run off the most? I am worried if I don't do it and just put the underlay/flooring down then I will get annoyed by it eventually.
Thanks all
- what is the best way of sealing the gap between the edge of the plywood and the wall where the skirting board was? Should I use some ply offcuts and tape them to wall and caulk where it meets the floor and do I need to caulk between the ply joints where the sheets are butted?
- The room is c. 28sqm. Is it wise to attempt to do the whole room or should I just be doing the dips and the bits that run off the most? I am worried if I don't do it and just put the underlay/flooring down then I will get annoyed by it eventually.
Thanks all