On a system if rads are cold at the bottom hot at the top. This is likely sludge? Worst on downstairs rads. Is an open vented system cast iron hex. Is power flushing the best option. Or would taking the rads. Outside to flush individually be better? Is microbore so concerned of clogging pipework with settled sludge at bottom of the rad. Thanks