Hi
I have a concrete patio that I am considering paving over without removing. It is a very firm base and hasn't moved/cracked for years. The problem I have is this
In the middle of the concrete patio is a soakaway. How do I factor for that in the new paved patio? Do I just extend the existing soakaway? Are there any shallow drainage channels I could use, bearing in mind I won't have much depth to play with?
Thanks
Paul.
I have a concrete patio that I am considering paving over without removing. It is a very firm base and hasn't moved/cracked for years. The problem I have is this
In the middle of the concrete patio is a soakaway. How do I factor for that in the new paved patio? Do I just extend the existing soakaway? Are there any shallow drainage channels I could use, bearing in mind I won't have much depth to play with?
Thanks
Paul.