I need to run a 13metre length of soil pipe, that toilet and sink will run into.
What gradient do I need for this horizontal run from the new manhole I'm fitting into the existing manhole 13 metre away..
I read somewhere 1:80 to prevent things getting stuck then other information advised 1:40??
Thanks
What gradient do I need for this horizontal run from the new manhole I'm fitting into the existing manhole 13 metre away..
I read somewhere 1:80 to prevent things getting stuck then other information advised 1:40??
Thanks