I'm putting up a new soil stack. The layout is as follows:
Underground Socket
Plain pipe
Access point (double socketed)
Pipe (socket at top)
92.5 Tee for toilet (socket at top)
Pipe (socket at top)
Offset bends - pipe - vent
Question is do I need to allow for expansion between the Underground socket and the access point? As in, do I have to withdraw the pipe by 10mm for each of these sockets? If so, do I then need a bracket on the access point?
Thanks