HI there,
im about to have a real wood floor layed and need the answer to a few question.
1. Do i paint the liquid DPM on top of the concrete then do the self levelling or vice versa?
2. How long roughly would i have to wait before the floor can be laid once ive used the self levelling compound?
3. Anyone recommend a good adhesive, i know its quite expensive and i have 39 sq m to cover.
I been told either Lumberjack, laybond or Mapei P990 1K???
Thx
im about to have a real wood floor layed and need the answer to a few question.
1. Do i paint the liquid DPM on top of the concrete then do the self levelling or vice versa?
2. How long roughly would i have to wait before the floor can be laid once ive used the self levelling compound?
3. Anyone recommend a good adhesive, i know its quite expensive and i have 39 sq m to cover.
I been told either Lumberjack, laybond or Mapei P990 1K???
Thx