K
kai
You appear to have a TNCS or PME earthed system - cause the main earth emerges off the top right side of the black service fuse block.
The main earth must be 16mm minimum and the main bonding must be 10mm minimum for such an install.
The main earth must be 16mm minimum and the main bonding must be 10mm minimum for such an install.