I'm in the middle of some alterations on my bungalow and have a few dilemmas, here's one of them.
I've taken up all of the floor at the back as it needed lowering in line with the new concrete floor of the utility room, I've fixed 6x2 joists with hangers and am ready to start boarding with 22mm t&g caberfloor, I was going to tight fit with 100mm celotex and foam fill all remaining gaps.
I've cleared all of the old debris, rubble, soil etc from underneath so it's spotless and there is a between 200mm and 300mm gap below joists.
Do I need a moisture barrier?
Also is this space best for my new wiring or should I drop down from the loft to each new socket/switch?
Any advice appreciated
I've taken up all of the floor at the back as it needed lowering in line with the new concrete floor of the utility room, I've fixed 6x2 joists with hangers and am ready to start boarding with 22mm t&g caberfloor, I was going to tight fit with 100mm celotex and foam fill all remaining gaps.
I've cleared all of the old debris, rubble, soil etc from underneath so it's spotless and there is a between 200mm and 300mm gap below joists.
Do I need a moisture barrier?
Also is this space best for my new wiring or should I drop down from the loft to each new socket/switch?
Any advice appreciated