Hi
It's been pointed out in a previous thread that I should be tanking the plasterboard in my bathroom before I tile, for use as a shower cubicle.
The area was previously a shower, over the bath, but just tiled onto plaster as far as i can tell.
It's going in an alcove, with two sides will be of new moisture resistant plasterboard, and the other will be existing plasterboard, that i presume is just standard PB.
Now that it has been pointed out, tanking seems like a good idea.
Has anyone any experience of this? I am looking at the Everseal Aquaseal Wet Room Tanking Kit?
Is this any good?
Thank you in advance
It's been pointed out in a previous thread that I should be tanking the plasterboard in my bathroom before I tile, for use as a shower cubicle.
The area was previously a shower, over the bath, but just tiled onto plaster as far as i can tell.
It's going in an alcove, with two sides will be of new moisture resistant plasterboard, and the other will be existing plasterboard, that i presume is just standard PB.
Now that it has been pointed out, tanking seems like a good idea.
Has anyone any experience of this? I am looking at the Everseal Aquaseal Wet Room Tanking Kit?
Is this any good?
Thank you in advance