Hi.
I’m renovating a project house and have had a new meter installed by western power with smart meter. They also installed some 100amp switches which is helpful.
I’ve done something similar to this before, but our main supply for the house comes into the garage, and from the garage, there is currently a 16mm old cable running to supply the house CU underground.
I want to replace this old cable with a new 16mm SWA from the house CU to the switch I have installed in the garage. How best would I terminate the SWA into the switch?
I have tidied up the board as per my photo, and just attached the old white cable that supplies the house to the switch temporarily.
Am I right in saying I could do away with the switch, terminate the SWA in a knockout box and run the tails directly into the black 100amp connector blocks?
I’m renovating a project house and have had a new meter installed by western power with smart meter. They also installed some 100amp switches which is helpful.
I’ve done something similar to this before, but our main supply for the house comes into the garage, and from the garage, there is currently a 16mm old cable running to supply the house CU underground.
I want to replace this old cable with a new 16mm SWA from the house CU to the switch I have installed in the garage. How best would I terminate the SWA into the switch?
I have tidied up the board as per my photo, and just attached the old white cable that supplies the house to the switch temporarily.
Am I right in saying I could do away with the switch, terminate the SWA in a knockout box and run the tails directly into the black 100amp connector blocks?