- Joined
- 20 Oct 2020
- Messages
- 109
- Reaction score
- 3
- Country
Which should I do first for my bathroom refit?
1) Fit wall to wall LVT (with holes for pipes / wastes etc) first and then tile down onto the floor?
2) Tile down onto the floor, and then lay in the LVT wall to wall up to the tiles?
Is it even a good idea to do wall to wall LVT and sit the bath / shower tray onto that?
In either case, do I need a bead of silicon between the floor and walls?
Many thanks.
P.S. this is my first attempt at a bathroom.
1) Fit wall to wall LVT (with holes for pipes / wastes etc) first and then tile down onto the floor?
2) Tile down onto the floor, and then lay in the LVT wall to wall up to the tiles?
Is it even a good idea to do wall to wall LVT and sit the bath / shower tray onto that?
In either case, do I need a bead of silicon between the floor and walls?
Many thanks.
P.S. this is my first attempt at a bathroom.